Scope
Fabric Awning Category--Class "AF": The scope of work of a Class "AF" specialty building contractor shall include and be limited to the installation of detachable cloth/synthetic cover awning material over an existing frame, including other materials incidental thereto, which become a permanent fixed part of buildings or other structures and which may be, in whole or in part, supported from a building wall erected and provided by others or may be self-supporting, including footings or slabs on grade in connection therewith. In order to be eligible to be certified as a Class "AF" specialty building contractor by the board, the applicant shall have at least one (1) year of practical experience in the category.
Examination Content Outline
The Fabric Awning Category – Class “AF” examination is based on trade-specific information pertaining to materials, tools, equipment, practices, terminology, and relevant laws. The examination is a two (2) hour, open book exam that consists of 30 questions.
Approved References
- Code of Federal Regulations – Title 29, Part 1926 (OSHA), 2010
- Fabric Awning and Canopy Building Code Reference, 2010 IFAI
- Florida Building Code(Building), 2010