Scope
Tests a candidate's knowledge of siding, window and door installation including vinyl, wood or aluminum siding, soffit, fascia, gutters and all types of windows and doors. This includes the work necessary to prepare or repair the substrate to accomplish proper installation. Does not include any structural alterations.
Examination Outline
- Open Book
- 50 Questions
- Time limit: 2 hours and 10 minutes
- 75% Correct required to pass
References
The following references are allowed in the testing center.
- 2010 Florida Building Code: Building Volume
- 2010 Florida Building Code: Residential Volume
- ASTM D 4756-06: Standard Practice for Installation of Rigid Poly(Vinyl Chloride) (PVC) Siding and Soffit, 2006
- Carpentry, Fourth Edition, 2006
- Carpentry and Building Construction, 2008
- Standard Specifications for Aluminum Siding, Soffit and Fascia (1402-86), 2003 Edition
- Code of Federal Regulations – Title 29, Part 1926 (OSHA)
For information on how to obtain exam references, please call at .