Scope
Tests a candidate’s knowledge of the installation, maintenance, repair, alteration, and extension of underground utilities.
Examination Outline
- Open Book
- 50 Questions
- Time limit: 2 hours and 30 minutes
- 75% Correct required to pass
References
The following references are allowed in the testing center.
- AWWA Standard for Installation of Ductile Iron Water Mains and Their Appurtenances, C600-05,2005
- Concrete Pipe Installation Manual
- Excavation and Grading Handbook, 2006
- Installation Guide for Ductile Iron Pipe
- Pipe and Excavation Contracting, 1987 Edition
- Code of Federal Regulations – Title 29, Part 1926 (OSHA) OR OSHA Excerpts for Contractors (from Title 26 CFR, Parts 1926 & 1910), Fourth Edition
For information on how to obtain exam references, please call at .